Dormer, extension, load-bearing wall or solar panels: when is a renovation permit-free and when do you need an omgevingsvergunning (environmental permit) or a notification? The rules under the Omgevingswet (Environment and Planning Act), the permit check, processing times and the risks of building without a permit, all in one place.

Planning a renovation without checking whether you need a permit can turn out expensive: in the worst case you have to reverse the work or you are hit with a penalty payment. Since 1 January 2024 the Omgevingswet (Environment and Planning Act) has applied, and with it the old omgevingsvergunning (environmental permit) for building, which replaced the bouwvergunning (building permit) in 2010, has been split in two. There is a technical part, which checks whether the structure complies with the building rules of the Besluit bouwwerken leefomgeving (Bbl, the Dutch Building Decree), and a spatial part, which checks whether the structure fits the omgevingsplan (environmental plan, the local zoning rules) of your municipality. For many small renovations you need neither. For others you need one of them, and sometimes both. In this article you can read which renovations are usually permit-free, when you do need a permit or notification, how the application works and what the risk is if you skip it.

Always start with the permit check

The only way to get certainty for your address is the official vergunningcheck (permit check) in the Omgevingsloket (the government's online environment and planning portal). You enter your address and the planned work and see for each element whether a permit or a notification is required, for both the technical and the spatial part. The check is free of charge and you can save the outcome as proof of what you entered. Do the check early in the process, preferably before you request quotes, so that the contractor knows what they have to take into account.

Why a general list is never the final word: when the Omgevingswet came into force, the national rules for permit-free building largely ended up in the municipality's omgevingsplan. Municipalities may adjust those rules and do so, for example making them stricter in a protected village conservation area or more generous on an industrial estate. What is permit-free in one municipality may require a permit in the neighbouring one.

Often permit-free

The following renovations are permit-free in most cases, as long as you stay within the conditions and the home is not a listed monument:

  • Internal renovations without changes to the load-bearing structure: a new kitchen or bathroom, moving non-load-bearing walls, floors, ceilings and pipework.
  • Ordinary maintenance: painting, replacing roof tiles, pointing, replacing window frames in the same size and layout.
  • Dormer at the rear, or on a side that does not border public space: with a flat roof, at least half a metre from the roof edges and usually no more than 1.75 metres high measured from the base of the dormer. A roofer or carpenter who regularly fits dormers knows these dimensions by heart.
  • Extension or outbuilding in the rear garden area: within four metres of the original rear wall, an extension may usually be taller than beyond that, and the total amount of building on the plot is capped. On a small plot that is often half of the building area; on larger plots sliding scales apply. Have the contractor or the permit check do this calculation, because the definition of building area is precise.
  • Solar panels on the roof, within the roof surface and at the same pitch as the roof.
  • Boundary fencing up to one metre high at the front and up to two metres at the rear, with conditions on the distance to public space.
  • Insulation on the inside of walls and roof. External wall insulation that changes the appearance of the facade often does require a permit.

Permit-free does not mean rule-free. A permit-free structure must still comply with the technical requirements of the Besluit bouwwerken leefomgeving, with neighbour law and with the welstand (local design and appearance) rules where they apply. What that means for your relationship with your neighbours is covered in Renovating and the neighbours: rights, obligations and good agreements.

Often a permit or notification required

  • Dormer at the front, or on a side that borders the public road.
  • Breaking through or removing a load-bearing wall. Spatially this is usually permit-free, but the technical side falls under the rules for the building activity and, for homes in consequence class 1, under the construction notification of the Wet kwaliteitsborging voor het bouwen (Wkb, the Quality Assurance in Construction Act). For renovations the introduction of that system has been phased and postponed several times; check the current situation in the Omgevingsloket and on rijksoverheid.nl. How the work itself proceeds is explained in Removing a load-bearing wall: rules, risks and step-by-step plan.
  • A rooftop addition, extra storey or raised ridge.
  • Extension at the front or side bordering public space, or an extension that is deeper or taller than the permit-free dimensions allow.
  • Renovations to a listed monument or in a protected town or village conservation area, including small changes to the exterior. For a rijksmonument (national monument) a permit for the national-monument activity is also required.
  • Changing window frames at the front: a different layout or a larger opening.
  • Demolition producing more than ten cubic metres of demolition waste or involving asbestos removal: a sloopmelding (demolition notification), as a rule at least four weeks in advance; only for the limited quantities of asbestos that a private individual may remove themselves does a period of at least one week apply.
  • Felling trees on your own plot: depending on the municipality, a tree-felling permit.
  • Splitting a home, letting rooms or a change of use, for example from office to residential.

If you live in a flat, there is one more layer: besides the municipality, the Vereniging van Eigenaars (VvE, owners' association) must also agree to changes to common parts. For that, read Renovating a flat in a VvE: permission, rules and steps.

What an environmental permit costs

The municipality charges leges (administrative fees) for processing an application. The amount differs per municipality and is set out in the legesverordening (fee regulation), which you can find on the municipality's website or via overheid.nl. For building activities the fees are usually a percentage of the construction cost, with a minimum amount for small jobs and rising rates for larger renovations. Because the fees are linked to the construction cost, it is wise to state a realistic and substantiated construction cost. Also bear in mind that for the application you often need building drawings and, for structural changes, a structural calculation. You have those made by an architectural draughtsman, architect or structural engineer; ask them for a quote in advance.

How long the procedure takes

  • Regular procedure: the municipality decides within eight weeks of receiving a complete application and can extend that period once by six weeks. After the decision there is an objection period of six weeks in which interested parties, such as neighbours, can lodge an objection.
  • Extended procedure: for a larger deviation from the omgevingsplan or for certain monuments a period of six months applies, with a draft decision on which anyone can comment.

Allow for the objection period in your planning: many tradespeople only want to start once the permit is final and irrevocable, because building while an objection is pending is at your own risk. How to fit the permit into your overall planning is explained in How to prepare for a renovation.

Building without a permit: the risks

If you build without a permit when one was required, the municipality can take enforcement action. That usually starts with a stop-work order and a letter giving you the choice: apply for a permit after all or remove the structure. If you do not comply, a last onder dwangsom (order subject to a penalty payment) can follow and, as a last resort, compulsory demolition at your expense. Legalising after the fact is sometimes possible, but only if the structure could also have been permitted through a regular application, and the municipality may charge higher fees for it.

An illegal renovation can also affect you outside of the municipality: when you sell, you must disclose it and the buyer can demand a price reduction, an insurer can refuse to pay out in the event of damage, and a neighbour who is bothered by your roof extension can ask the municipality to take enforcement action, after which it is in principle obliged to act.

Applying for a permit: how it works

  1. Do the permit check in the Omgevingsloket and keep the outcome.
  2. If in doubt, request a preliminary consultation, also called a conceptaanvraag (draft application) or omgevingsoverleg (planning consultation). The municipality then informally reviews your plan before you submit the formal application. That sometimes costs fees, but it prevents a refusal and a second round of drawing work.
  3. Have drawings and, if necessary, a structural calculation made. The municipality asks for a site plan, floor plans, elevations and cross-sections of the existing and the new situation.
  4. Submit the application via the Omgevingsloket with DigiD (the Dutch government login). You can authorise a contractor, architect or adviser to do this on your behalf.
  5. Inform your neighbours in advance. That is not mandatory, but it is sensible: most objections arise from surprise, not from the structure itself. Show them the drawings before the municipality publishes the decision.
  6. Wait for the objection period to end before you start, or discuss with the contractor what risk you are taking if you start earlier.

A good contractor or carpenter knows the rules in your municipality and can often prepare the application for you. When agreeing the quote, record who submits the application, who supplies the drawings and what happens if the permit comes later than planned. On VerbouwPro you post your renovation free of charge and tradespeople from your region with a verified profile and reviews respond.

Frequently asked questions

Is a dormer at the rear always permit-free?
Usually yes, if the dormer has a flat roof, stays at least half a metre from the roof edges, remains within the maximum height and the home is not a monument or located in a protected conservation area. Municipalities can deviate in their omgevingsplan (environmental plan), so always check with the permit check in the Omgevingsloket.
Do I need a permit to remove a load-bearing wall?
Spatially this is usually permit-free, but the structural change falls under the technical building rules and, for homes in consequence class 1, under the construction notification of the Wkb (Quality Assurance in Construction Act) as soon as it applies to renovations. Always have a structural engineer do the calculations and check the current rules in the Omgevingsloket and with the municipality.
How do I know if my house is a listed monument?
You can find national monuments in the Rijksmonumentenregister (national monuments register) of the Rijksdienst voor het Cultureel Erfgoed (Cultural Heritage Agency of the Netherlands). Municipal monuments and protected town and village conservation areas are listed on your municipality’s website and in the omgevingsplan. With a monument, even small changes to the exterior require a permit.
What does an environmental permit for a renovation cost?
The municipality charges fees according to its fee regulation. For building activities the fees are usually a percentage of the construction cost with a minimum amount; rates differ per municipality. Also allow for the cost of building drawings and possibly a structural calculation.
Do I need a permit for a heat pump?
Not for the indoor unit. The outdoor unit is permit-free in most cases, but it must comply with the noise requirement at the property boundary from the Besluit bouwwerken leefomgeving (Dutch Building Decree) and with any placement rules set by the municipality. For a monument or in a protected conservation area a permit may be required.

Related articles

Regulations

Permit-free rear extension: the rules for the back garden

An extension at the back of the home is in many cases permit-free, but only if you stay within fixed dimensions: the depth from the original rear facade, the height and the percentage of the plot you may build on. Under the Omgevingswet, those dimensions are in the bruidsschat (the transitional national rules) of your municipality's omgevingsplan, alongside the technical building requirements of the Besluit bouwwerken leefomgeving. This article explains how the two tests work, which dimensions apply, what neighbour law says, which technical building requirements always remain and who to hire for the work.

Read more
Advice

Renovating and the neighbours: rights, duties and good agreements

A renovation always affects the neighbours: noise, dust, construction traffic and sometimes a crack in their wall. What are you allowed to do, what are they allowed to do, what does neighbour law say and how do you keep relations good, from the first announcement to the last skip.

Read more
Regulations

Installing a dormer: permit-free or permit required?

A dormer at the rear is permit-free in many cases, a dormer at the front almost never. Under the Omgevingswet (Environment and Planning Act) national dimensions apply that take precedence over your municipality's omgevingsplan (local environmental plan); at the front the municipality decides and the welstand (design review) has a say. Which dimensions apply, how the permit check and the application work, what neighbour law and the VvE say, which insulation and ventilation requirements the Bbl sets and whether to choose prefab or traditional.

Read more

More in Regulations

Regulations

Fitting a roof window: permit-free, leaks and what the carpenter does

More daylight and fresh air in the attic without a dormer: a roof window is often the simplest solution. Which type suits your roof, when is a roof window or rooflight permit-free, including at the front, what changes for a listed building or in a VvE (owners' association), how does the carpenter deal with rafters and purlins, why does a roof window leak and which VAT rate applies?

Read more
Regulations

Paying a deposit to your contractor: what is normal and how do you pay safely in instalments?

"Thirty per cent on signing, before Monday please": many renovations start with a request for a deposit. It is not compulsory. What the law does and does not say, which instalment arrangement is common in the industry, why the 5% rule only applies to new builds, how a deposit with a notary or a bank guarantee works, what an invoice must contain and which signs suggest you had better not pay in advance.

Read more
Regulations

Contractor goes bankrupt during the renovation: what now?

The building site has gone quiet, nobody answers the phone any more and the insolvency register lists your contractor as bankrupt. What happens now to your contract, to the instalments you have already paid and to the materials lying on your driveway? Step by step: the curator and Article 37 of the Faillissementswet (Dutch Bankruptcy Act), your claim as an unsecured creditor, subcontractors knocking on your door, the guarantee of a quality mark, your insurance, restarting with a new contractor and how to keep this risk small on your next renovation.

Read more

Need a tradesperson?

Find a qualified tradesperson near you. Post your job for free, or sign up on VerbouwPro as a tradesperson.