Renovating and the neighbours: rights, duties and good agreements

7 October 20269 min readVerbouwPro Editorial Team

A renovation always affects the neighbours: noise, dust, construction traffic and sometimes a crack in their wall. What are you allowed to do, what are they allowed to do, what does neighbour law say and how do you keep relations good, from the first announcement to the last skip.

For you, a renovation is an investment in your home; for the neighbours it means months of noise, dust and a skip outside the door without getting anything in return. Most neighbour disputes in the Netherlands do not start with a legal conflict, but with the feeling of not having been informed. At the same time, you have rights: you may renovate, you may cause temporary nuisance and in certain cases you may even use the neighbours' property. In this article you will read what neighbour law (burenrecht) regulates, what the municipality is responsible for, how to prevent and record damage to the neighbouring property, and how to keep relations good.

Inform the neighbours before the first skip arrives

Nothing works as well as dropping by in person before the work starts. Tell them what you are going to do, roughly how long it will take, when the noisy phases are (demolition, drilling, piling for a foundation) and how they can reach you or the contractor. A note through the letterbox with a schedule and a phone number is a good addition, not a replacement. Ask about their situation too: does someone work from home, does a baby sleep during the day, is there an exam week? Small adjustments to the schedule cost you little and generate a lot of goodwill. Also read How to prepare for a renovation.

Agree with your contractor who will be the point of contact for the neighbours during the work. A neighbour who has nowhere to take a complaint calls the municipality or the police; a neighbour who can speak to the site manager usually sorts it out in two minutes.

Noise and working hours: the municipality decides

How much noise a renovation may make and at what times is regulated nationally in the Besluit bouwwerken leefomgeving (Bbl, the Dutch Building Decree) for commercial construction and demolition work, and additionally in your municipality's Algemene Plaatselijke Verordening (APV, the local by-laws). The rules differ per municipality. It is common for commercial building work to be allowed on working days during the daytime, for example from seven in the morning to seven in the evening, and for an exemption to be required for evening, night and Sunday work or for very loud work. Check the rules of your own municipality on the municipal website or call the customer contact centre, and include the agreement on working hours in the contract with the contractor. A municipality can halt the work in the event of a violation.

In addition, the general prohibition on unlawful nuisance from Book 5 of the Dutch Civil Code applies: you may not cause the neighbours nuisance that, given its severity, duration and the circumstances, is unreasonable. Temporary construction noise on working days is generally not unlawful; weeks of grinding on Sunday mornings may well be.

Construction traffic, parking and the skip

A skip, scaffolding, site hut or crane on the public road or pavement is not allowed just like that. In most municipalities this requires a permit or notification under the APV, sometimes with precariobelasting (a tax for using public space). Often the skip company or the contractor arranges this; ask about it and ask for a copy. Do not put the skip in a spot that blocks the neighbours' view or driveway, and do not leave it there longer than necessary; a full skip waiting weeks to be collected is a classic source of irritation. On your own property you do not need a permit, but you should still keep the neighbours in mind: a skip against the boundary opposite their bedroom window is not prohibited, but not sensible either.

Agree with the contractor where construction traffic loads and unloads and where the vans park; a van that blocks the neighbours' driveway every day causes more conflicts than the demolition itself. Make sure the pavement is swept clean at the end of the day.

Boundary, windows and shared walls: neighbour law

Book 5 of the Dutch Civil Code regulates what neighbours must tolerate from each other and what they need not. The most important rules for a renovation:

  • Windows and balconies. Within 2 metres of the boundary you may not create windows, balconies or other openings that give a view of the neighbours' property, unless they give permission. Fixed, opaque openings that let in light without offering a view are allowed. A dormer or extension with a side window close to the boundary therefore calls for a conversation and written permission.
  • Party wall. A wall that stands exactly on the boundary and separates two buildings is usually mandelig (a jointly owned party wall): the common property of both neighbours. You may build against it and insert beams or anchors up to half its thickness without causing damage, but you may not make drastic changes or an opening in it without consultation. Both neighbours share the cost of maintenance and renewal. See also Removing a load-bearing wall: rules, risks and step-by-step plan.
  • Building over the boundary. If you accidentally build a little over the boundary, for example a roof edge or foundation, the neighbours can in principle demand its removal. Only if that causes disproportionate harm can the court opt for an easement or a transfer of the land against compensation. For an extension up to the boundary, have the boundary marked out by the Kadaster (Land Registry) or a surveyor.
  • Using the neighbours' property. If your contractor temporarily has to stand on the neighbours' property to reach a facade or erect scaffolding, the neighbours must tolerate this if the work could otherwise not be carried out, or only with much more difficulty, provided you announce it in advance and compensate any damage. This is sometimes called the ladderrecht (ladder right). Always simply ask first.

Many of these rules are non-mandatory law: neighbours may agree something else together. Put such agreements in writing and, for permanent arrangements such as a window within 2 metres of the boundary, have a notary register them as an easement, so that they also apply to future owners.

Preventing and recording damage to the neighbouring property

Demolition, piling, drilling and digging cause vibrations and settlement that can lead to cracks, loose tiles or sticking doors at the neighbours'. As the client you can be liable for this, alongside the contractor. Three measures limit the risk and the discussion afterwards.

  1. Ask the contractor about their insurance. A CAR insurance policy (contractor's all risks) covers damage to the work itself and often also damage to existing property and adjacent buildings during construction; a business liability insurance policy covers damage to third parties. Ask for the policy schedules and check whether adjacent properties are included and what the excess is. How to assess insurance and other features of a good contractor is explained in 5 tips for choosing the right contractor.
  2. Have a pre-construction structural survey carried out. Before the start, an independent building survey firm records the condition of the neighbours' home, with dated photos of all walls, ceilings, facades and existing cracks, in a report that both parties sign. This baseline survey is no luxury when opening up a shared wall, building an extension up to the boundary or doing foundation work. Without a baseline survey, every crack the neighbours find later will be attributed to your renovation.
  3. Agree the working method. For work close to the neighbours, agree with the contractor which techniques will be used to limit vibrations, for example sawing instead of chiselling, and who is the first point of contact if there is damage.

If damage does occur, report it immediately to the contractor and your own insurer, take photos and have the neighbours do the same. Do not promise anything about amounts; let the insurers handle it.

Neighbours objecting to your permit

If you need an omgevingsvergunning (environmental permit), for example for a roof extension or a large extension, the municipality publishes the decision and interested parties, including the neighbours, can lodge an objection within 6 weeks of publication. An objection does not automatically suspend the permit, but if you carry on building while an objection is pending, you do so at your own risk: if the permit is revoked, the municipality can demand demolition. The neighbours can also ask the court for interim relief.

The best way to prevent an objection is to let the neighbours look at the drawings before the application. An objection is often about a single detail, a window or the height of a roof edge, which you can easily adjust in the design. Which renovations are permit-free is explained in When do you need a permit?. Permit-free, by the way, does not mean that neighbour law does not apply.

Preventing and resolving conflicts

  • Stay in touch during the work. A short message ahead of an extra noisy day or a delay works wonders, as does a bunch of flowers afterwards.
  • Respond to complaints. Take every complaint seriously, go and have a look together, explain and adjust what is reasonable.
  • Neighbourhood mediation. Many municipalities offer free buurtbemiddeling (neighbourhood mediation) through a welfare organisation: trained volunteers guide a conversation between neighbours. It is easy to access and prevents escalation.
  • Legal advice. If things get stuck, the Juridisch Loket (the Dutch legal aid desk) gives free initial advice, and your legal expenses insurance or a lawyer can help. Proceedings before the subdistrict court take a long time and damage the relationship further; see them as the last step.
  • Neighbours and the contractor. If a neighbour approaches your carpenter or contractor about a problem, make sure they report it to you. You remain both the client and the neighbour.

On VerbouwPro you post your renovation free of charge, and contractors, carpenters and other tradespeople from your region with a verified profile and reviews respond. In your job description, ask about experience with working in a densely built-up area and about their insurance; anyone who answers that readily will also take the neighbours into account on the building site.

Frequently asked questions

Do I have to ask the neighbours for permission for a renovation?
No, for a renovation on your own property you do not need the neighbours' permission, only possibly a permit from the municipality. Permission is needed for windows or balconies with a view within 2 metres of the boundary and for drastic changes to a jointly owned party wall (mandelige muur). Informing them is always sensible.
At what times may a contractor make noise?
This is regulated by the Besluit bouwwerken leefomgeving (the Dutch Building Decree) and your municipality's Algemene Plaatselijke Verordening (local by-laws). It is common to build on working days during the daytime; evening, night and Sunday work usually requires an exemption. Check the rules of your own municipality and record the working hours in the contract with the contractor.
Who pays for damage to the neighbours' house caused by my renovation?
The party that caused the damage, usually the contractor, but you as the client can also be held liable. Check in advance whether the contractor has a CAR (contractor's all risks) policy and a liability policy that covers damage to adjacent buildings, and have a pre-construction structural survey carried out so that it is clear which damage is new.
Can the neighbours stop my renovation?
They can lodge an objection to an omgevingsvergunning (environmental permit) within 6 weeks of publication and possibly ask the court for interim relief. With a permit-free renovation they can only take action if you breach neighbour law, for example with a window within 2 metres of the boundary, or cause unlawful nuisance.
May a skip stand in front of the neighbours' door?
A skip on the public road requires a permit or notification under the APV (local by-laws) in most municipalities, regardless of whose door it stands in front of. Preferably place it in front of your own home, do not block driveways and do not leave it longer than necessary. Consult the neighbours in advance if there is no other option.

Related articles

Regulations

When do you need a permit for a renovation

Dormer, extension, load-bearing wall or solar panels: when is a renovation permit-free and when do you need an omgevingsvergunning (environmental permit) or a notification? The rules under the Omgevingswet (Environment and Planning Act), the permit check, processing times and the risks of building without a permit, all in one place.

Read more
Regulations

Putting up a fence or boundary partition: rules, height and neighbour law

A fence of up to one metre is permit-free everywhere; behind the front facade a boundary partition of two metres is allowed, but your municipality can deviate from that. On top of that, neighbour law determines who can demand that a partition be put up, who owns a fence on the boundary and who pays for maintenance. How to be certain of the property boundary, which material lasts a long time and how to put your agreements with the neighbours on record.

Read more
Regulations

Felling a tree in your garden: when do you need a felling permit?

Whether you may fell a tree in your own garden is decided by your municipality: the rules are set out in the omgevingsplan (municipal environment plan) and differ from place to place, usually with a threshold for trunk girth and a list of protected trees. On top of that come the bird breeding season and the protection of animals, neighbour law on branches and distance from the boundary, and your duty of care as owner in the event of storm damage. When to apply for a permit, when pruning is enough and when to bring in a tree surgeon.

Read more

More in Advice

Advice

Quality marks in construction explained: BouwGarant, Woningborg, SWK, Techniek Nederland, KOMO, VCA, Erkend Installateur

Logos on the van, the website and the quote: BouwGarant, Woningborg, SWK, Techniek Nederland, KOMO, VCA, Erkend Installateur. But who awards such a quality mark, what has been assessed and what concrete use is it to you if something goes wrong? For each quality mark you can read what it gives you, what it specifically does not say and how to check in a register whether a company is genuinely entitled to use it, including the statutory CO certification for gas work.

Read more
Advice

Recognising and replacing lead water pipes: rules, health and approach

If you live in a house built before 1960, there may still be lead in the water pipes. How to recognise a lead pipe by its colour, a scratch and its sound, what the Gezondheidsraad (Health Council of the Netherlands) advises for children and pregnant women, who is responsible up to and beyond the water meter, what you can demand as a tenant, how to combine the replacement smartly with a renovation and which tradesperson to hire.

Read more
Advice

Plumber, installer or heating engineer: who do you call for what?

A dripping tap, a central heating boiler showing a fault, a new bathroom, a heat pump or a leaking gutter: who do you call? The boundaries between plumber, installer and heating engineer have blurred, but not disappeared. For each job you can read which tradesperson you need, which work only certified companies may do, when something is a genuine emergency and what to have ready before you call.